mcww@mcww.com.eg 048-2176423
  • For his part, the Governor of Menoufia stressed his keenness to conduct field and continuous follow-up of all projects taking place on the ground, and to provide all possibilities to support infrastructure projects in order to raise the level of services provided to citizens, stressing the importance of field work and follow-up of projects to reach the highest rates of completion and raise the level of services.
  • Today, Major General Ibrahim Abu Laymoun, Governor of Menoufia, accompanied by Dr. Engineer Mohamed Naguib Saleh, Chairman of the Board of Directors of the Drinking Water and Sanitation Company in Menoufia, inspected the Al-Qarnain Water Station in Al-Bajour within citizens
  • The governor listened to a detailed explanation from the head of the company about the station, which consists of 4 turbid pumps with a pump capacity of 90 kilowatts per hour, 4 filter pumps with a capacity of 250 kilowatts per hour, 2 siphons with a siphon capacity of 7000 m3, and 8 sand filters with a capacity of 250 kilowatts per hour. The filter is 56 m3, alum and chlorine chemicals, and the generating unit.
  • The company president added that there are 3 filter washing pumps with a capacity of 75 kilowatt-hours, each with a capacity of 75 kilowatt-hours, there are 4 siphon pumps with a capacity of 132 kilowatt-hours each, and a ground tank with a capacity of 10,000 m3.
  • He pointed out that the first stage supplies the city of Al-Bajur from the Bahr Al-Qarnain water source with an expulsion line with a diameter of 1200 mm to 400 mm, and 3 injection points are being connected for the second stage.